project portfolio
Ireland House
-
Commercial office fit out for the Consulate Generale of Ireland headquarters.
-
Address: Ireland House 200 Park Ave
General Contractor: JT Magen
Client: Irish Consulate
Project Type: Office Interiors
SOTHEBY'S 945 MADISON
-
Infrastructure upgrade at the iconic Breuer Building, transforming the former Whitney Museum.
-
Address: 945 Madison
General Contractor: JT Magen
Client: Sotheby’s
Project Type: Infrastructure
Netflix
-
Commercial office fit-out for a media and broadcast company.
-
Address: 888 Broadway 5th Fl
General Contractor: JT Magen
Client: Netflix Inc.
Project Type: Retail, Office Interiors
herald tower
-
Full building infrastructure upgrades converting to modular air source heat pumps for heating & cooling, with high pressure Con Edison steam as a backup.
-
Address: 50 West 34th Street
General Contractor: Pavarini McGovern
Client: JEMB
Project Type: Infrastructure
199 water street
-
Complex turnkey replacement of all existing perimeter dual temperature risers in a fully occupied commercial building.
-
Address: 199 Water Street
General Contractor: Jack Resnick & Sons
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey
Lever House
-
Commercial tenant fit out of the 4th, 5th, 6th, 7th, 8th & 9th Floor.
-
Address: 390 Park Ave
General Contractor: JT Magen
Client: CBRE
Project Type: Office Interiors
scholastics
-
Commercial office infrastructure upgrades of the existing condenser water system.
-
Address: 130 Mercer Street
General Contractor: Pinley Mechanical
Client: Scholastics
Project Type: Infrastructure, Turnkey
aston martin
-
Flagship luxury retail project featuring tightly coordinated MEP systems and high-efficiency HVAC operation.
-
Address: 450 Park Avenue
General Contractor: JT Magen
Client: Aston Martin
Project Type: Retail
Puck building
-
Multi-floor fit out in the historic Puck Building for Open AI and hedge fund Quadrature.
-
Address: 295 Lafayette Street 4th Floor
General Contractor: Structure Tone
Client: Quadrature / Open AI
Project Type: Office Interiors
3 times square
-
Infrastructure upgrades of existing system and install of new water cooled modular chiller system.
-
Address: 3 Times Square
General Contractor: Turner Construction
Client: Rudin Management
Project Type: Infrastructure
bronx prep school
-
Turnkey installation of 24 rooftop units completed on a tight schedule while the school was closed.
-
Address: 3872 Third Avenue
General Contractor: Pinley Mechanical
Client: Bronx Prep Charter High School
Project Type: Infrastructure, Turnkey
609 6th avenue
-
Extensive commercial reposition that included surveying and relocating existing active building systems.
-
Address: 609 5th Avenue
General Contractor: Pavarini McGovern
Client: SL Green
Project Type: Infrastructure, Reposition
425 lexington avenue
-
Commercial infrastructure upgrade, demolition and integration with existing building systems.
-
Address: 425 Lexington Avenue
General Contractor: Pinley Mechanical
Client: Vanbarton Group
Project Type: Infrastructure, Turnkey
1290 avenue of americas
-
Rooftop lounge and pavilion project featuring tightly coordinated MEP systems, modular water-cooled HVAC units, and architecturally exposed flat-oval ductwork delivered within tight structural constraints in collaboration with the broader project team.
-
Address: 1290 Avenue of Americas
General Contractor: Pavarini McGovern
Client: Vornado Realty
Project Type: Office Interiors
Memorial Sloan Ketering
-
Commercial fit out of seven 13,000 sq.ft floors in a new construction building.
-
Address: 323 East 61st Street
General Contractor: Cauldwell Wingate
Client: Memorial Sloan Ketering
Project Type: Office Interiors, New Construction
990 avenue of americas
-
Full commercial reposition with new condenser water system and 100% OA unit.
-
Address: 990 Avenue of the Americas
General Contractor: Pinley Mechanical
Client: Vanbarton Group
Project Type: Infrastructure, Turnkey
first republic bank
-
Four-floor commercial fit-out featuring kitchen ventilation systems for a future café.
-
Address: 460 West 34th Street
General Contractor: Archstone Builders
Client: SL Green
Project Type: Financial, Office Interiors
ASPCA
-
This turnkey project replaced two 100% OA rooftop units in an active animal housing facility utilizing temporary systems during the swing over.
-
Address: 434 92nd Street
General Contractor: Pinley Mechanical
Client: ASPCA
Project Type: Infrastructure, Turnkey
french consulate
-
Turnkey project replacing the building’s heating and cooling infrastructure.
-
Address: 934 Fifth Avenue
General Contractor: Pinley Mechanical
Client: French Consulate
Project Type: Infrastructure, Turnkey
222 Broadway
-
Installing temporary & permanent systems prior to the repositioning of existing commercial building.
-
Address: 222 Broadway
General Contractor: Pinley Mechanical
Client: GFP Real Estate
Project Type: Infrastructure, Building Reposition
alexander wang
-
Completed base building upgrades to achieve a precise, industrial workspace aesthetic.
-
Address: 139 Beekman St
General Contractor: EW Howell
Client: Alexander Wang
Project Type: Retail, Office Interiors
1755 Broadway
-
Extensive multi-phase replacement of fifteen 50-ton water-cooled Mammoth units in an occupied commercial space. The project maintained continuous tenant cooling via temporary systems throughout the entire project.
-
Address: 1755 Broadway
General Contractor: Pinley Mechanical
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey
55 Hudson
-
Completed large floor fit-outs of the 22nd & 47th floor featuring fan-powered boxes, CRAC units, utility fans, & BMS controls.
-
Address: 55 Hudson Yards
General Contractor: L&K Partners
Client: Related Companies
Project Type: Office Interiors
41 Madison Avenue
-
A multiple commercial tenant floor fit out on the 9th, 17th, 21st, 22nd, 23rd and the 33rd floor.
-
Address: 41 Madison Avenue
General Contractor: Structure Tone
Client: Rudin Management
Project Type: Commercial Fit-Out