project portfolio
990 Avenue of Americas
-
Full commercial reposition with new condenser water system and 100% OA unit.
-
Address: 990 Avenue of the Americas
General Contractor: Pinley Mechanical
Client: Vanbarton Group
Project Type: Infrastructure, Turnkey
110 East 59th Street
-
Turnkey infrastructure upgrade to enhance system reliability and building operations.
-
Address: 110 East 59th Street
General Contractor: Jack Resnick & Sons
Client: Jack Resnick & Sons
Project Type: Infrastructure / Turnkey
Scholastics
-
Commercial office infrastructure upgrades of the existing condenser water system.
-
Address: 130 Mercer Street
General Contractor: Pinley Mechanical
Client: Scholastics
Project Type: Infrastructure, Turnkey
199 Water Street
-
Complex turnkey replacement of all existing perimeter dual temperature risers in a fully occupied commercial building.
-
Address: 199 Water Street
General Contractor: Jack Resnick & Sons
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey
1755 Broadway
-
Extensive multi-phase replacement of fifteen 50-ton water-cooled Mammoth units in an occupied commercial space. The project maintained continuous tenant cooling via temporary systems throughout the entire project.
-
Address: 1755 Broadway
General Contractor: Pinley Mechanical
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey
ASPCA
-
This turnkey project replaced two 100% OA rooftop units in an active animal housing facility utilizing temporary systems during the swing over.
-
Address: 434 92nd Street
General Contractor: Pinley Mechanical
Client: ASPCA
Project Type: Infrastructure, Turnkey
Bronx Prep school
-
Turnkey installation of 24 rooftop units completed on a tight schedule while the school was closed.
-
Address: 3872 Third Avenue
General Contractor: Pinley Mechanical
Client: Bronx Prep Charter High School
Project Type: Infrastructure, Turnkey