This project delivered a full-scale mechanical systems upgrade, highlighted by the installation of new HVAC and piping infrastructure. Major work included adding three 1,370 GPM cooling towers on modified steel dunnage, two 1,850 GPM plate and frame heat exchangers, and new condenser and chilled water loops supported by multiple high-capacity pumps. Two custom 24,000 CFM 100% outdoor air handling units were installed for the DOAS system, along with new duct risers equipped with fire/smoke dampers for future tenant connections.

Significant modernization also included replacing two 500-ton chillers with new 450-ton and 550-ton York centrifugal units, a new 10,000 MBH shell-and-tube heat exchanger for tenant hot water, and upgraded 8” hot water risers. The project also involved replacing the ConEd steam PRV station, installing supplemental HVAC units in the lobby and back-of-house spaces, and ensuring all systems were integrated to enhance building efficiency and tenant comfort.

Address: 390 Park AveNUE
General Contractor: Pavarini McGovern
Client: Brookfield Properties
Project Type: COMMERCIAL Infrastructure

PROJECT OVERVIEW

Large industrial chiller with pipes, gauges, and control panel in a mechanical room.
Construction site with a large crane lifting a white building module, surrounded by tall glass and brick buildings in an urban city.
Construction workers on a rooftop installing or repairing HVAC units with a city skyline and partly cloudy sky in the background.
A construction site on a city street with a large yellow crane truck. A worker wearing a white hard hat and a high-visibility vest stands observing the scene. Other workers are nearby, and scaffolding is visible on the left side of the image.
City street under construction with tall skyscrapers on both sides, construction crane in the middle, street closed signs, and workers in high-visibility vests.