trevor day school

INFRASTRUCTURE

Address: 312 East 95th STREET
General Contractor: Jt magen
Client: trevor day school
Project Type: Infrastructure, TURNKEY

PROJECT OVERVIEW

At Trevor Day School, the team delivered a comprehensive modernization of the central condenser water and cooling infrastructure within a tight summer-break window. The project included furnishing and rigging two 300-ton SPX Marley fluid coolers, engineering and installing new 8-inch exterior condenser water risers over nine floors, and upgrading building pumps while converting the system to a 30% propylene glycol solution for improved reliability and freeze protection. New floor distribution ductwork and water-cooled AC units were installed on administrative levels, supported by field-assembled plate-and-frame heat exchangers that integrate the condenser water system with a geothermal heat recovery loop. All work was completed in just two months with zero disruption to school operations, demonstrating precise phasing, coordination, and execution in an active educational environment.

Marley LW Fluid Cooler installation by Pinley Mechanical. Video produced by SPX Cooling Tech.

VIEW MORE PROJECTS