project portfolio
warren street hotel
-
Constructed an 11-story luxury boutique hotel with high-end finishes & advanced MEP coordination.
-
Address: 86 Warren Street
General Contractor: Pavarini McGovern
Client: Firmdale Hotels
Project Type: New Construction, Infrastructure
SOTHEBY'S 945 MADISON
-
Infrastructure upgrade at the iconic Breuer Building, transforming the former Whitney Museum.
-
Address: 945 Madison
General Contractor: JT Magen
Client: Sotheby’s
Project Type: Infrastructure
110 EAST 59TH STREET
-
Turnkey infrastructure upgrade to enhance system reliability and building operations.
-
Address: 110 East 59th Street
General Contractor: Jack Resnick & Sons
Client: Jack Resnick & Sons
Project Type: Infrastructure / Turnkey
herald tower
-
Full building infrastructure upgrades converting to modular air source heat pumps for heating & cooling, with high pressure Con Edison steam as a backup.
-
Address: 50 West 34th Street
General Contractor: Pavarini McGovern
Client: JEMB
Project Type: Infrastructure
199 water street
-
Complex turnkey replacement of all existing perimeter dual temperature risers in a fully occupied commercial building.
-
Address: 199 Water Street
General Contractor: Jack Resnick & Sons
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey
Lever House
-
Commercial tenant fit out of the 4th, 5th, 6th, 7th, 8th & 9th Floor.
-
Address: 390 Park Ave
General Contractor: JT Magen
Client: CBRE
Project Type: Office Interiors
990 avenue of americas
-
Full commercial reposition with new condenser water system and 100% OA unit.
-
Address: 990 Avenue of the Americas
General Contractor: Pinley Mechanical
Client: Vanbarton Group
Project Type: Infrastructure, Turnkey
pier 94 studios
-
A challenging barge crane operation for which our team executed with precision and safety.
-
Address: Pier 94 711 12th Ave
General Contractor: JT Magen
Client: Vornado Realty
Project Type: Infrastructure, New Construction
609 5th avenue
-
Extensive commercial reposition that included surveying and relocating existing active building systems.
-
Address: 609 5th Avenue
General Contractor: Pavarini McGovern
Client: SL Green
Project Type: Infrastructure, Reposition
3 times square
-
Infrastructure upgrades of existing system and install of new water cooled modular chiller system.
-
Address: 3 Times Square
General Contractor: Turner Construction
Client: Rudin Management
Project Type: Infrastructure
bronx prep school
-
Turnkey installation of 24 rooftop units completed on a tight schedule while the school was closed.
-
Address: 3872 Third Avenue
General Contractor: Pinley Mechanical
Client: Bronx Prep Charter High School
Project Type: Infrastructure, Turnkey
trevor day school
-
Time-sensitive infrastructure replacement to resolve critical system issues in an active environment.
-
Address: 312 East 95th Street
General Contractor: JT Magen
Client: Trevor Day School
Project Type: Infrastructure
canopy hotels
-
New high-rise hotel construction with a focus on guest comfort, energy efficiency, & MEP systems.
-
Address: 255 West 34th Street
General Contractor: Pavarini McGovern
Client: Maverick Real Estate Partners
Project Type: Infrastructure, New Construction
45 ROCKEFELLER CENTER
-
Relocated the cooling tower system to a higher bulkhead level, freeing roof space for new offices.
-
Address: 1 Rock 21st Floor
General Contractor: JT Magen
Client: Tishman Spire
Project Type: Office Interiors
1212 6TH AVENUE
-
Comprehensive commercial building repositioning elevating efficiency and tenant amenities.
-
Address: 1212 6th Avenue
General Contractor: Pavarini McGovern
Client: Stawskti Partners
Project Type: Infrastructure, Building Reposition
41 madison avenue
-
A multiple commercial tenant floor fit out on the 9th, 17th, 21st, 22nd, 23rd and the 33rd floor.
-
Address: 41 Madison Avenue
General Contractor: Structure Tone
Client: Rudin Management
Project Type: Infrastructure
222 broadway
-
Installing temporary & permanent systems prior to the repositioning of existing commercial building.
-
Address: 222 Broadway
General Contractor: GFP Properties
Client: GFP Real Estate
Project Type: Infrastructure, Building Reposition
ASPCA
-
This turnkey project replaced two 100% OA rooftop units in an active animal housing facility utilizing temporary systems during the swing over.
-
Address: 434 92nd Street
General Contractor: Pinley Mechanical
Client: ASPCA
Project Type: Infrastructure, Turnkey
french consulate
-
Turnkey project replacing the building’s heating and cooling infrastructure.
-
Address: 934 Fifth Avenue
General Contractor: Pinley Mechanical
Client: French Consulate
Project Type: Infrastructure, Turnkey
1755 Broadway
-
Extensive multi-phase replacement of fifteen 50-ton water-cooled Mammoth units in an occupied commercial space. The project maintained continuous tenant cooling via temporary systems throughout the entire project.
-
Address: 1755 Broadway
General Contractor: Pinley Mechanical
Client: Jack Resnick & Sons
Project Type: Infrastructure, Turnkey